How To Pour Footings and set levels accurately

Pouring a footing using a spirit level and peg method. The aim is to give accuracy and keep the tools out the concrete after its poured. Its advised not to leave the roofing battens in the footings. This Technique is great for garden walls and and small projects. On larger sites a laser level can be used. Steels (reinforcing bar or mesh) in the footings are optional and not necessary unless specified in the project brief.

Ready mixed concrete is wheelbarrowed in on a time limit, although a hose and pump can be hired at an extra charge depending on the site conditions.

The original trenches were dug out by a micro digger after being sprayed out.