Redwood Deck and Stamped Concrete Patio Makeover Timelapse Build

Welcome to our YouTube channel! In this video, we take you through the process of a landscaping project from start to finish. From the initial stamped concrete pour to the final touches on the deck, we showcase the various steps and techniques involved in creating a beautiful and functional outdoor space. You’ll see our team installing a fence, laying out the deck, digging and pouring the footings, installing steel raised beds, planting trees, and much more. Tune in to see the end result – a stunning deck with a redwood finish and a sleek cable rail. Thanks for watching and don’t forget to subscribe for more landscaping inspiration!

▬ Contents of this video ▬▬▬▬▬▬▬▬▬▬

0:00 – Stamped Concrete pour
0:42 – Fence installation
0:56- Deck Layout
1:03 – Digging deck footings
1:08 – Steel raised bed installation
1:30 – Setting footing forms
2:03 – Planting screening trees
2:22- Rebar cage installation for footings
2:27- Concrete pour for deck footings
3:01- Attaching deck posts to footing
3:11-Installing beam
3:22 -Ledger attachment
3:27-Joist installation
4:20- Blocking and joist tape
4:56-Stair installation
5:34- Redwood decking and railing installation
6:53- Cable rail installation
7:43- Finishing touches
7:53- End result!